Modular Classrooms in Ireland, Priced by the Room
Pick the room type, floor area and purchase or hire route. See realistic Irish ex VAT budgets on screen. Then one local modular school supplier rings you with a written proposal.
Free, no obligation. One local supplier prices it, not five.
- €180,000 to €280,00080 m² permanent classroom turnkey, ex VAT
- 12 to 18 weeksfactory build to on-site school handover
- NZEB A2/A3Dept of Education TGD, 60-year design life
- 3,938Irish primary, special & post-primary schools
Six Irish school modular buildings, priced plainly
Select a room type for full Department TGD specifications and ex VAT Irish cost breakdowns.
Mainstream 80 m² classroomFrom €180,000 ex VAT turnkey
SEN & autism special suiteFrom €380,000 ex VAT turnkey
SET & resource teaching roomFrom €48,000 ex VAT turnkey
Multi-classroom 2-storey blockFrom €420,000 ex VAT turnkey
Early years & ECCE crèche unitFrom €135,000 ex VAT turnkey
Temporary hire prefab classroomFrom €280/wk ex VAT hirePrice my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A mainstream modular classroom, about 80 m² (1 classroom), permanent turnkey build: €180,000 to €280,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
From yard check to classroom handover
- Check your room budget firstPick mainstream, SEN, SET, multi-storey block, ECCE crèche or hire to view Irish ex VAT ranges before sharing a number.
- One supplier walks the school yardYour outline goes to one Irish modular builder covering your county to verify crane reach, ESB load, drainage and TGD layout.
- Built off site, craned during holidaysSteel modules are fitted out in the factory while groundworks finish on site, then lifted in over Easter, mid-term or Summer.
Old prefab guesswork, or a written TGD spec
Old prefab guesswork
- Headline shell price quoted with craneage, pads and drainage left out
- Thin walls and poor roofs that fail Part L NZEB and TGD-021-5 acoustics
- Multiple sales reps chasing the principal from a shared directory
Written TGD modular spec
- Guide budget shown on screen before any phone number is requested
- 60-year steel frame, A2/A3 heat-pump spec, Part M ramp and BCAR scope set out
- One Irish modular school supplier reviews the site and quotes in writing
Four questions principals and boards ask first
- Will I be hounded with calls?
- No. Your project brief goes to a single modular school supplier in your county, and nobody else. No shared list and no cold calls from five competing firms.
- Are permanent modular classrooms built to Department TGD standards?
- Yes. Permanent Irish school modules use galvanised structural steel frames rated for 60 years, NZEB A2/A3 insulation, air-to-water or VRF heat pumps, MVHR ventilation and TGD-021-5 acoustic ceilings.
- Do we need full planning permission for one classroom?
- Existing schools can often use Class 57 for a once-off single-storey permanent extension up to 210 m², or Class 20D for temporary 5-year units up to 30% of floor area. Fire Safety Certificate, DAC and BCAR still apply.
- Can modules be lifted without disrupting term time?
- Yes. Concrete pad foundations and service ducts are prepared in advance, and finished modules are craned onto the yard over Easter, mid-term or Summer holidays in 1 to 2 days for a single classroom.

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.
Irish school modular costs by room specification
All figures are stated ex VAT for level school yards before complex ESB substation upgrades or storm attenuation tanks.
Mainstream 80 m²
- Typical floor area
- 80 m² incl. en-suite WC
- Irish guide cost (ex VAT)
- €180,000–€280,000
- Acoustic standard
- TGD-021-5 (RT ≤ 0.6 s)
- Factory to handover
- 12–18 wks
SEN / Autism suite
- Typical floor area
- 150 to 250 m² base
- Irish guide cost (ex VAT)
- €380,000–€780,000
- Acoustic standard
- TGD-021-5 (RT ≤ 0.4 s)
- Factory to handover
- 14–22 wks
SET resource room
- Typical floor area
- 15 to 30 m² room
- Irish guide cost (ex VAT)
- €48,000–€95,000
- Acoustic standard
- RT ≤ 0.6 s, DnT,w ≥ 45 dB
- Factory to handover
- 12–18 wks
Temporary hire
- Typical floor area
- 60 to 80 m² unit
- Irish guide cost (ex VAT)
- €280–€450/wk
- Acoustic standard
- School-spec partitions
- Factory to handover
- 4–8 wks
Every site-enabling line item, from concrete pad foundations to BCAR fees and hire mobilisation, is broken down on modular classroom costs in Ireland.
How floor area and TGD room schedules set the budget
Department of Education room schedules define net internal area before corridor links and external ramps.
Across Ireland's 3,938 recognised primary, special and post-primary schools, turnkey permanent modular pricing tracks closely to €2,200 to €3,400/m² ex VAT for mainstream teaching rooms and €2,500 to €3,700/m² ex VAT for specialist SEN suites. Complex Additional School Accommodation (ASA) projects bundling full yard re-engineering, attenuation tanks and design fees average higher. See ASA scheme & modular frameworks.
Irish school planning, BCAR and TGD rules in brief
Planning exemptions speed up delivery, but statutory building control sign-off still applies to every classroom.
- Class 57 permanent extension (up to 210 m²). Under S.I. No. 114 of 2021, an existing school may erect one single-storey permanent extension up to 210 m² to the side or rear, at least 2 m from party boundaries.
- Class 20D temporary school accommodation (up to 5 years). Existing schools may install temporary modular classrooms up to 30% of existing floor area (maximum 2 storeys) for up to 5 years.
- FSC, DAC and BCAR are mandatory. Every new Irish school modular building requires a Fire Safety Certificate, Disability Access Certificate, BCMS Commencement Notice and BCAR Assigned Certifier.
- TGD Part L, Part M and TGD-021-5. Permanent units must achieve NZEB A2/A3 BER with heat pumps and MVHR, compliant 1:20 or 1:15 access ramps, and reverberation times at or below 0.6 s (0.4 s for SEN).
Read the full statutory walkthrough on planning, BCAR, FSC and DAC for modular classrooms and all technical guides.
Delivering to schools across all 26 counties
Select your county in the estimator so a supplier handling your region assesses gate widths, crane reach and local council rules.
Hauling 3.6 m to 4.2 m wide factory modules into an active Irish school yard depends on gate pier clearances, overhead cables, coastal wind exposure and local authority traffic permits. Explore dedicated regional notes for Dublin, Cork, Galway, Limerick, Kildare, Meath & Wicklow and all 26 counties.
Five items every school modular quote should state
Confirm these before your Board of Management or patron body signs off an order.
- Structural design life and frame spec. Written confirmation of 60-year structural design life in galvanised hot-rolled or cold-formed steel to IS EN 1993.
- Department TGD room schedule. Exact net internal m² matching TGD-022 (80 m² mainstream incl. en-suite WC and wet area) or TGD-026 / SDG-02-04 (SEN base).
- Part L NZEB & BER target. Air-to-water or VRF heat pump model, MVHR heat recovery ventilation flow rate, CO2 sensors and target A2 or A3 non-domestic BER.
- TGD-021-5 acoustic compliance. Acoustic ceiling absorption class, partition DnT,w rating and roof rain-noise build-up achieving RT ≤ 0.6 s (or ≤ 0.4 s for SEN).
- Part M accessibility scope. Concrete or galvanised ramp at 1:20 or 1:15 with 1,200 mm clear width, 1,500 mm landings, handrails, level thresholds and Part M WC.
The complete ten-point specification checklist is on classroom costs in Ireland.
Questions boards and principals ask most
How much does an 80 m² modular classroom cost in Ireland?
A permanent 80 m² mainstream modular classroom in Ireland costs €180,000 to €280,000 ex VAT turnkey on a level school yard (€2,200 to €3,400/m² ex VAT). A 150 to 250 m² SEN autism special class suite runs €380,000 to €780,000 ex VAT turnkey, a 15 to 30 m² SET room costs €48,000 to €95,000 ex VAT, and temporary classroom hire runs €280 to €450 per week ex VAT plus €18,000 to €42,000 ex VAT for craneage, pads and connections. View full cost breakdown.
How long does it take to deliver a permanent modular classroom?
A permanent single mainstream classroom or SET room takes 12 to 18 weeks from order sign-off to handover, with modules craned onto cured concrete pads in 1 to 2 days during school holidays. SEN suites take 14 to 22 weeks and multi-classroom two-storey blocks take 18 to 28 weeks.
Do Irish schools need planning permission for modular classrooms?
Under S.I. No. 114 of 2021, existing schools can add a once-off single-storey permanent extension up to 210 m² under Class 57 (at least 2 m from party boundaries), or temporary school structures up to 5 years and 30% of existing floor area (max 2 storeys) under Class 20D. Planning exemption never waives Fire Safety Certificate (FSC), Disability Access Certificate (DAC) or BCAR Assigned Certifier sign-off. Read planning and BCAR rules.
What is inside a Department-spec SEN autism modular suite?
A standard 150 to 250 m² SEN base combines a classroom, central activity area, quiet withdrawal room, multisensory room, assisted hygiene and sluice toilet, staff base and direct access to a secure fenced soft-play yard. SEN & autism suites.
When does buying a permanent modular classroom beat hiring a prefab?
Over a 3 to 5 year horizon, weekly hire payments plus upfront craneage, pads, service tie-ins and end-of-lease removal routinely reach 45% to 65% of a permanent unit's purchase price while leaving the school with zero asset. Permanent vs temporary prefab.
What VAT rate applies to school modular classrooms in Ireland?
Turnkey permanent modular building contracts that include supply, foundations and permanent installation qualify for 13.5% VAT under Revenue's two-thirds rule. Modular classroom rental, hire agreements and loose classroom furniture carry 23% VAT.
Are modular classrooms warm and quiet enough for Irish winters?
Permanent school modules achieve A2 or A3 non-domestic BER ratings under Part L NZEB using air-to-water or VRF heat pumps, MVHR heat recovery ventilation and acoustic ceiling and roof build-ups meeting TGD-021-5. NZEB heating & ventilation.
Is modularclassroom.ie part of the Department of Education?
No. modularclassroom.ie is an independent Irish resource, not the Department of Education, the NCSE or a government body, and does not award ASA funding. Your room outline and contact number go to a single modular school supplier in your county, and nobody else. They review yard access, TGD specification and budget before issuing a written proposal.
