Groundworks, pad foundations, ESB power and crane lifts
Concrete pad foundations (€14,000 to €28,000 ex VAT for one room), foul/storm drainage (€12,000 to €35,000), ESB three-phase checks and swept-path crane surveys finish before modules leave the factory, letting cranes lift a single classroom in 1 to 2 days over school holidays.
How site preparation runs alongside factory manufacture so steel classroom modules land safely onto your school yard during Easter or Summer holidays.
Free, no obligation. One local supplier prices it, not five.
- €14,000–€28,000pad foundations (1 room), ex VAT
- €3,500–€9,500mobile crane day rate, ex VAT
- 1 to 2 dayscrane lift for 1 classroom
- Easter / Julzero term-time disruption

Four site checks to complete before signing a modular order
- Gate width & swept-path crane survey. Modular bays travel 3.6 m to 4.2 m wide and up to 14 m long. Measure gate pier widths, check turning radii off the public road and note overhead ESB/Eir lines or protected trees.
- Ground bearing & concrete pad foundations. Most Irish yards take reinforced concrete pad foundations or strip beams poured 3 to 4 weeks ahead of delivery. Soft peat, made ground or estuary clay requires trial holes and engineered piling or raft beams.
- Foul sewage & storm water invert levels. Confirm depth and fall from the new classroom's en-suite WC and roof downpipes to the existing school manhole. Shallow existing sewers may require a small packaged pumping chamber or SuDS soakaway/attenuation crate.
- ESB Networks three-phase MIC capacity. An electrical contractor checks the school's existing Maximum Import Capacity (MIC) and main switchboard spare ways. Adding multiple heat-pump classrooms can trigger an ESB upgrade with a 12 to 20 week utility lead time.
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A mainstream modular classroom, about 80 m² (1 classroom), permanent unit & crane lift: €140,000 to €218,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
Scheduling safe crane lifts around the Irish school calendar
Safety rules under the Health and Safety Authority (HSA) Construction Regulations strictly separate heavy mobile cranes and articulated wide-load haulage from pupils and parents. Irish modular builders align manufacturing schedules with the school calendar so groundworks stay inside heras-fenced compounds while major crane days land cleanly inside:
- July and August Summer break. Ideal window for multi-classroom 2-storey blocks, SEN wings and full foul/storm trenching across active yards.
- Two-week Easter break. Suits single 80 m² mainstream classrooms, SET rooms and temporary decant classroom lifts.
- October or February mid-term (plus Saturday lifts). Works well for compact 15 to 30 m² SET modules where pads and ducts are already cured.
- Traffic management & Garda escort permits. Urban schools whose crane must set outriggers on the public street book council road-closure permits 4 to 6 weeks in advance.
Related school modular guides
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
Multi-classroom 2-storey block2 to 6+ classroom blocks for primary, post-primary, ETB and campus sites.
Part M ramps & accessibility1:20 and 1:15 ramp gradients, handrails, landings, thresholds and accessible WCs.
Planning, BCAR, FSC & DACClass 57 (210 m²), Class 20D (5-year temporary), Assigned Certifier and certs.
Dublin modular classroomsUrban yard lifts, road crane permits and two-storey footprint savings.
Temporary hire prefab classroomWeekly rental rates, mobilisation costs and the 3 to 5 year buy-vs-hire point.School modular questions answered
Can our school use its own local civil contractor for pads and drainage?
Yes. Selecting the 'unit & crane' delivery route saves roughly 22% off the builder's turnkey price while letting your own groundworks contractor pour pads to the supplier's engineer-certified foundation drawings.
What if overhead ESB wires cross the school gate?
ESB Networks can shroud low-voltage lines or arrange a temporary shut-down/diversion on lift day. Flagging overhead cables at the very first yard walk avoids weeks of delay.
How long after crane day can pupils move into the classroom?
Allow 2 to 3 weeks after craning a single classroom (or 5 to 8 weeks on a multi-storey block) for module joint weather-sealing, internal vinyl welding, ramp installation, M&E commissioning, acoustic testing and BCAR sign-off.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.