Early years, ECCE crèche and Montessori modular buildings
A permanent 60 to 120 m² ECCE crèche or Montessori modular building costs €135,000 to €240,000 ex VAT turnkey for a single sessional/full-day room and €265,000 to €460,000 ex VAT for a twin-playroom facility.
Purpose-built pre-school and full-day childcare rooms engineered around Tusla Regulation 30 clear floor space, child-height sanitary ware and safe outdoor play.
Free, no obligation. One local supplier prices it, not five.
- €135,000–€240,000single 60–80 m² ECCE unit, ex VAT
- 2.3 m²/childTusla Reg 30 full-day (3–6 yrs)
- 1.818 m²sessional ECCE min (max 22 kids)
- NZEB A2/A3warm, draught-free floor spec

Sizing your modular building around Tusla Regulation 30 clear floor space
Under Regulation 30 of the Child Care Act 1991 (Early Years Services) Regulations 2016, Tusla's Early Years Inspectorate measures clear floor space, strictly excluding staff cupboards, nappy change stations, toilets, sleep rooms, kitchens and lobbies. Planning gross modular area around clear net room space avoids costly capacity reductions at registration inspection.
Sessional ECCE (3–6 yrs, max 22)
- Minimum clear floor space
- 1.818 m² per child
- Example room (20–22 children)
- 40 m² clear playroom
- Recommended gross modular build
- 65 to 80 m² incl. child WCs, lobby & office
Full / part-time day care (3–6 yrs)
- Minimum clear floor space
- 2.3 m² per child
- Example room (20–22 children)
- 46 to 51 m² clear playroom
- Recommended gross modular build
- 80 to 100 m² incl. kitchenette & sanitary
Toddlers (2–3 yrs)
- Minimum clear floor space
- 2.35 m² per child
- Example room (20–22 children)
- 35 to 42 m² clear playroom
- Recommended gross modular build
- Paired in 120 to 200 m² multi-room crèche
Wobblers (1–2 yrs) & Babies (0–1 yr)
- Minimum clear floor space
- 2.8 m² / 3.5 m²
- Example room (20–22 children)
- Separate sleep room & milk kitchen
- Recommended gross modular build
- Custom 150 to 250 m² full day care hub
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
An early years / ECCE modular unit, about 80 m² (1 classroom), permanent turnkey build: €135,000 to €240,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
Child-safe internal specification for Irish crèche inspections
- Junior sanitary ware & nappy changing. Low-height junior WCs with half-height privacy partitions, anti-scald TMV3 basins, separate staff WC and dedicated hygienic nappy-change bench with sluice.
- Anti-finger-trap doors & low glazing. Full-length hinge guards on every internal door, safety laminated glazing below 1,500 mm and recessed low-surface-temperature heating.
- Food-prep kitchenette & HSE hygiene finishes. Wipe-clean Altro/safety vinyl coved up skirtings, separate handwash basin and lockable cleaning/chemical store.
- Direct canopy-covered outdoor play access. Level Part M doorway straight onto secure fenced play surfacing for daily outdoor curriculum hours.
Related school modular guides
Planning, BCAR, FSC & DACClass 57 (210 m²), Class 20D (5-year temporary), Assigned Certifier and certs.
NZEB, heat pumps & MVHRPart L A2/A3 BER, air-to-water or VRF heat pumps and classroom CO2 control.
Part M ramps & accessibility1:20 and 1:15 ramp gradients, handrails, landings, thresholds and accessible WCs.
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
SET & resource room15–30 m² small-group teaching spaces, acoustic partition specs and yard siting.
Groundworks, pads & crane liftsPad foundations, foul/storm drainage, ESB three-phase loads and holiday lifts.School modular questions answered
How big does a modular building need to be for 22 ECCE sessional children?
22 children at 1.818 m² requires 40 m² of unobstructed clear play space alone. Once you add child WCs, accessible adult WC, cloak lobby, kitchenette and storage, plan for a 65 to 80 m² gross building.
Do ECCE modular buildings qualify for school planning exemptions?
No. Class 57 and Class 20D apply to recognised primary and post-primary schools. Standalone private or community crèches require commercial planning permission, Fire Safety Certificate, DAC and Tusla registration.
Can an existing primary school add an ECCE unit on campus?
Many Irish school campuses host co-located community or private ECCE services on leased yard edges. Check patron consent, separate utility sub-metering and dedicated drop-off parking with your planning authority.
How fast can a modular Montessori unit open?
Factory fabrication runs 12 to 18 weeks once planning, FSC and DAC are granted, allowing installation before the September ECCE intake.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.