Permanent 80 m² modular classrooms in Dublin cost €180,000 to €280,000 ex VAT turnkey on level school yards, with SEN autism suites from €380,000 ex VAT and temporary hire from €280/week ex VAT.
Urban school yards, mobile crane road-closure permits, multi-storey space saving and rapid SEN expansion across all four Dublin local authorities.
Free, no obligation. One local supplier prices it, not five.
- €180k–€280k80 m² permanent room, ex VAT
- 4 councilsDCC, Fingal, SDCC & DLR
- 2 storeyspreferred on tight city yards
- Easter / Julstandard crane lift windows

Local school site factors in Dublin
- Tight urban gates and street crane permits. Older Victorian and suburban national schools across Dublin City, Dún Laoghaire and Rathfarnham rarely allow articulated low-loaders inside the yard. Suppliers frequently station an 80 to 130 tonne all-terrain crane on the public road under a local authority road-opening or traffic-management permit during Easter or July holidays.
- Two-storey footprint preservation. Where tarmac yard space is already near Department play-area minimums, stacking two 80 m² classrooms vertically over a 100 m² footprint preserves yard play space while delivering 160 to 200 m² of teaching area.
- Fast-growing Fingal and South Dublin corridors. Rapid housing delivery in Swords, Balbriggan, Adamstown, Citywest and Lucan drives high demand for multi-classroom ASA expansions, SEN autism bases and standalone ECCE crèche modules.
- Existing storm attenuation and Irish Water connections. Urban Dublin school sites often trigger strict Sustainable Drainage System (SuDS) attenuation rules when replacing grass pitches with hardstanding or modular roofs.
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A mainstream modular classroom, about 80 m² (1 classroom), permanent turnkey build, in Co. Dublin: €180,000 to €280,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
Planning authorities, ETB and budgets in Dublin
Planning authorities
- Local context in Dublin
- Dublin City Council, Fingal County Council, South Dublin County Council and Dún Laoghaire-Rathdown County Council
Regional ETB context
- Local context in Dublin
- City of Dublin ETB (CDETB) and Dublin and Dún Laoghaire ETB (DDLETB)
Typical single-room budget
- Local context in Dublin
- €180,000 to €280,000 ex VAT turnkey (80 m² mainstream)
SEN autism base budget
- Local context in Dublin
- €380,000 to €780,000 ex VAT turnkey (150–250 m²)
Preferred crane windows
- Local context in Dublin
- Easter break, October/February mid-term and July–August Summer holidays
Compare full line-by-line costs on modular classroom costs in Ireland and statutory sign-off steps on planning, BCAR, FSC and DAC.
Classroom specifications for Dublin schools
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
SEN & autism special suite150–250 m² sensory, withdrawal, central activity and assisted-hygiene bases.
ASA scheme & modular frameworkHow Additional School Accommodation funding and modular frameworks operate.
NZEB, heat pumps & MVHRPart L A2/A3 BER, air-to-water or VRF heat pumps and classroom CO2 control.
TGD-021-5 classroom acoustics0.6 s mainstream and 0.4 s SEN reverberation targets, walls and rain noise.
Groundworks, pads & crane liftsPad foundations, foul/storm drainage, ESB three-phase loads and holiday lifts.School modular questions answered
How much does a modular classroom cost in Dublin?
A permanent 80 m² mainstream modular classroom in Dublin typically costs €180,000 to €280,000 ex VAT turnkey, before complex road-closure crane permits, ESB substation upgrades or storm attenuation.
Which council handles Class 57 or Section 5 declarations in Dublin?
School planning applications, Section 5 declarations (€80, 4 weeks), Fire Safety Certificates and Disability Access Certificates in this region are handled by Dublin City Council, Fingal County Council, South Dublin County Council and Dún Laoghaire-Rathdown County Council.
How fast can a modular classroom be delivered in Dublin?
A permanent single mainstream classroom or SET room takes 12 to 18 weeks from order sign-off to handover, with modules craned onto cured concrete pads in 1 to 2 days during school holidays. SEN suites take 14 to 22 weeks and multi-classroom two-storey blocks take 18 to 28 weeks.
Who rings back after I submit a request for Dublin?
Your room outline and contact number go to a single modular school supplier in your county, and nobody else. They review yard access, TGD specification and budget before issuing a written proposal.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.