Modular classrooms in Cork
Permanent 80 m² modular classrooms in Cork cost €180,000 to €280,000 ex VAT turnkey on level school yards, with SEN autism suites from €380,000 ex VAT and temporary hire from €280/week ex VAT.
Marine-grade external finishes for harbour and coastal yards, suburban expansion around Cork City, and rural national school SET rooms.
Free, no obligation. One local supplier prices it, not five.
- €180k–€280k80 m² permanent room, ex VAT
- C4 / C5coastal marine steel coating
- 12–18 wksfactory build to school handover
- 26 countydirect Irish haulage network

Local school site factors in Cork
- Marine-grade cladding and coastal detailing. Schools near Cork Harbour, Cobh, Kinsale, Clonakilty, Bantry and Youghal face salt-laden south-westerly gales. Permanent steel modular frames here specify marine-grade powder-coated aluminium flashings, stainless steel fixings and sheltered heat-pump enclosures.
- Cork City commuter ring growth. Ballincollig, Carrigaline, Midleton, Glanmire and Douglas continue to add mainstream classrooms, SET rooms and autism special classes faster than traditional block extensions can complete.
- Rural West and North Cork access surveys. Narrow boreens, stone gateway piers and overhanging trees in West Cork require a pre-order swept-path check for 13 m to 16 m module delivery trailers.
- Cork ETB and further education blocks. Post-primary and PLC campuses across Cork regularly deploy multi-bay modular science, workshop and seminar blocks built off site to avoid term-time noise.
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A mainstream modular classroom, about 80 m² (1 classroom), permanent turnkey build, in Co. Cork: €180,000 to €280,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
Planning authorities, ETB and budgets in Cork
Planning authorities
- Local context in Cork
- Cork City Council and Cork County Council
Regional ETB context
- Local context in Cork
- Cork Education and Training Board (CETB)
Typical single-room budget
- Local context in Cork
- €180,000 to €280,000 ex VAT turnkey (80 m² mainstream)
SEN autism base budget
- Local context in Cork
- €380,000 to €780,000 ex VAT turnkey (150–250 m²)
Preferred crane windows
- Local context in Cork
- Easter break, October/February mid-term and July–August Summer holidays
Compare full line-by-line costs on modular classroom costs in Ireland and statutory sign-off steps on planning, BCAR, FSC and DAC.
Classroom specifications for Cork schools
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
SEN & autism special suite150–250 m² sensory, withdrawal, central activity and assisted-hygiene bases.
ASA scheme & modular frameworkHow Additional School Accommodation funding and modular frameworks operate.
NZEB, heat pumps & MVHRPart L A2/A3 BER, air-to-water or VRF heat pumps and classroom CO2 control.
TGD-021-5 classroom acoustics0.6 s mainstream and 0.4 s SEN reverberation targets, walls and rain noise.
Groundworks, pads & crane liftsPad foundations, foul/storm drainage, ESB three-phase loads and holiday lifts.School modular questions answered
How much does a modular classroom cost in Cork?
A permanent 80 m² mainstream modular classroom in Cork typically costs €180,000 to €280,000 ex VAT turnkey, before complex road-closure crane permits, ESB substation upgrades or storm attenuation.
Which council handles Class 57 or Section 5 declarations in Cork?
School planning applications, Section 5 declarations (€80, 4 weeks), Fire Safety Certificates and Disability Access Certificates in this region are handled by Cork City Council and Cork County Council.
How fast can a modular classroom be delivered in Cork?
A permanent single mainstream classroom or SET room takes 12 to 18 weeks from order sign-off to handover, with modules craned onto cured concrete pads in 1 to 2 days during school holidays. SEN suites take 14 to 22 weeks and multi-classroom two-storey blocks take 18 to 28 weeks.
Who rings back after I submit a request for Cork?
Your room outline and contact number go to a single modular school supplier in your county, and nobody else. They review yard access, TGD specification and budget before issuing a written proposal.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.