Temporary and hire prefab classrooms in Ireland
Hiring a standard 60 to 80 m² school modular classroom in Ireland costs €280 to €450 per week ex VAT on a 3 to 5 year contract, or €340 to €540 per week ex VAT for 1 to 2 year decant hire, plus €18,000 to €42,000 ex VAT for delivery, craneage, pads and removal.
Rapid-deployment relocatable classrooms for emergency enrolment surges and decant teaching during main school refurbishments.
Free, no obligation. One local supplier prices it, not five.
- €280–€450/wk3–5 year classroom hire, ex VAT
- €340–€540/wk1–2 year decant hire, ex VAT
- €18,000–€42,000mobilisation, crane & pads, ex VAT
- 5 yearsClass 20D temporary planning cap

Weekly hire rates vs upfront mobilisation costs
Weekly rental is only half the budget of a hired classroom. Even on a 12-month decant contract during a roof or fire-upgrade project, the school still pays for two crane days (delivery and collection), concrete pad pads or steel jack-legs, service tie-ins, Part M access ramps and reinstatement of tarmac when the units leave.
Small SET / office (15–40 m²)
- 3–5 yr hire (ex VAT)
- €150–€240/wk
- 1–2 yr hire (ex VAT)
- €190–€290/wk
- Upfront & exit mobilisation (ex VAT)
- €12,000 to €24,000
Single classroom (60–80 m²)
- 3–5 yr hire (ex VAT)
- €280–€450/wk
- 1–2 yr hire (ex VAT)
- €340–€540/wk
- Upfront & exit mobilisation (ex VAT)
- €18,000 to €42,000
Twin classroom (150–180 m²)
- 3–5 yr hire (ex VAT)
- €520–€860/wk
- 1–2 yr hire (ex VAT)
- €640–€1,050/wk
- Upfront & exit mobilisation (ex VAT)
- €32,000 to €72,000
Multi-room decant block (250–500 m²)
- 3–5 yr hire (ex VAT)
- €980–€1,950/wk
- 1–2 yr hire (ex VAT)
- €1,180–€2,350/wk
- Upfront & exit mobilisation (ex VAT)
- €58,000 to €135,000
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A custom school or hire modular unit, about 80 m² (1 classroom), 3 to 5 year hire: €280 to €450/wk ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
When hiring makes financial sense, and when buying wins
When hire is the right call
- Duration needed
- 12 to 30 months during a funded permanent build
- Capital budget
- Funded from rental/decant allowance without capital grant
- VAT rate
- 23% standard VAT on rental invoices
- End-of-term asset
- Zero residual asset; de-hire crane & reinstatement bill
When permanent purchase wins
- Duration needed
- 3.5 years or longer (or permanent enrolment growth)
- Capital budget
- Board, patron or ASA capital budget available
- VAT rate
- 13.5% reduced VAT on turnkey build contracts
- End-of-term asset
- 60-year permanent NZEB school building owned outright
Related school modular guides
Permanent 60-year vs prefabStructural steel frame, U-values, acoustic floors and 20-year lifecycle cost.
Planning, BCAR, FSC & DACClass 57 (210 m²), Class 20D (5-year temporary), Assigned Certifier and certs.
Groundworks, pads & crane liftsPad foundations, foul/storm drainage, ESB three-phase loads and holiday lifts.
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
Mainstream 80 m² classroomTGD-022 floor layout, en-suite WC, wet area, NZEB heating and turnkey costs.
Multi-classroom 2-storey block2 to 6+ classroom blocks for primary, post-primary, ETB and campus sites.School modular questions answered
How quickly can a hired prefab classroom arrive on a school yard?
Refurbished or stock modular classrooms can be delivered and commissioned in 4 to 8 weeks once Class 20D/planning, FSC/DAC and pad works are cleared.
Do temporary hired classrooms meet Department of Education specs?
Modern Irish hire fleet classrooms can be specified with heat pumps, double glazing, Part M ramps and IS 3218 fire alarms, though refurbished stock units rarely match the airtightness and 60-year durability of brand-new permanent modular builds.
How long can a temporary classroom stay under Class 20D?
Class 20D permits temporary school structures on an existing school site for up to 5 years (capped at 30% of existing gross floor area and maximum 2 storeys).
Is end-of-lease removal included in the weekly rental rate?
Almost never. Always request the fixed de-commissioning, return haulage and crane demobilisation fee in writing at the start of the hire agreement.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.