Multi-classroom two-storey modular school blocks
A permanent two-classroom modular block costs €420,000 to €680,000 ex VAT turnkey, while 4 to 6 classroom two-storey school and ETB blocks run €820,000 to €1,850,000 ex VAT (€2,300 to €3,400/m² ex VAT), delivered in 18 to 28 weeks.
2 to 6+ classroom permanent wings for primary schools, post-primary schools, ETBs and third-level campuses where yard space is tight.
Free, no obligation. One local supplier prices it, not five.
- €420,000–€680,0002-classroom block, ex VAT
- €820,000–€1,850,0004–6 room 2-storey block, ex VAT
- 50% lessground footprint vs single-storey
- 18–28 wksfactory build to handover

When a two-storey school modular block beats spreading across the yard
Urban primary schools, post-primary campuses and Education and Training Board (ETB) colleges rarely have 400 m² of spare level ground without sacrificing ball courts or bus drop-off lanes. Stacking volumetric steel classrooms two storeys high halves the concrete foundation footprint and keeps corridor runs short and warm.
2-classroom block (1 or 2 storey)
- Gross floor area
- 170 to 210 m²
- Typical turnkey range (ex VAT)
- €420,000 to €680,000
- Typical school use
- Primary expansion, twin mainstream or specialist art/music wing.
4-classroom 2-storey block
- Gross floor area
- 360 to 440 m²
- Typical turnkey range (ex VAT)
- €820,000 to €1,280,000
- Typical school use
- Urban national school, post-primary general classrooms + staff WC.
6-classroom 2-storey campus wing
- Gross floor area
- 540 to 650 m²
- Typical turnkey range (ex VAT)
- €1,250,000 to €1,850,000
- Typical school use
- ETB further-education centre, secondary school labs or university decant.
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A multi-classroom modular block, 250 to 600 m² (3 to 6+ rooms), permanent turnkey build: €820,000 to €1,850,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
Fire, acoustic floor and lift engineering on two-storey builds
- 60-minute structural fire compartmentation. Part B non-domestic fire rules require protected escape stair cores, FD30S/FD60S doors, cavity barriers and emergency refuge intercoms on upper landings.
- Part M passenger or platform lift. Any two-storey school block with upper-floor teaching rooms requires step-free vertical access sized for wheelchairs and assistant support.
- Concrete-composite acoustic upper floors. Pouring lightweight concrete or heavy cementitious board decks inside factory modules eliminates footsteps and chair scrape into the classroom underneath.
- Architectural cladding that fits the campus. Brick slips, standing-seam metal, Equitone fibre-cement or charred larch cladding integrates cleanly beside older masonry school buildings.
Related school modular guides
Planning, BCAR, FSC & DACClass 57 (210 m²), Class 20D (5-year temporary), Assigned Certifier and certs.
Groundworks, pads & crane liftsPad foundations, foul/storm drainage, ESB three-phase loads and holiday lifts.
NZEB, heat pumps & MVHRPart L A2/A3 BER, air-to-water or VRF heat pumps and classroom CO2 control.
Part M ramps & accessibility1:20 and 1:15 ramp gradients, handrails, landings, thresholds and accessible WCs.
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
Mainstream 80 m² classroomTGD-022 floor layout, en-suite WC, wet area, NZEB heating and turnkey costs.School modular questions answered
Does a two-storey modular school block need full planning permission?
Permanent two-storey school blocks require full planning permission (Class 57 covers single-storey permanent extensions only). Temporary 2-storey school blocks up to 30% of existing floor area can qualify under Class 20D for up to 5 years.
How long does cranage take for a 4- or 6-classroom two-storey block?
Allow 4 to 8 days of crane lifting during Summer or Easter holidays, followed by 5 to 8 weeks of corridor linking, lift commissioning, fire-alarm integration and BCAR testing.
Can two-storey modular blocks house post-primary science or tech rooms?
Yes. Structural bay spans and floor loadings (3.0 to 4.0 kN/m²) accommodate demonstration labs, wood/metalwork benches, fume extraction ducts and three-phase workshop circuits.
Can third-level universities and ETBs use permanent modular teaching blocks?
Yes. ETBs, Institutes of Technology and universities regularly deploy 2-storey modular seminar, lecture and lab wings to open capacity inside a single academic year.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.