Irish school modular guides and TGD standards

Every Irish modular classroom must satisfy non-domestic Building Regulations (Part B fire, Part L NZEB, Part M access, BCAR) alongside Department of Education Technical Guidance Documents where state-funded.

Technical walkthroughs for Boards of Management, principals, ETBs and childcare operators covering Department TGDs, planning exemptions, BCAR, acoustics, NZEB heating and site logistics.

Free, no obligation. One local supplier prices it, not five.

  • TGD-022 / 026Irish primary & SEN design guides
  • RT ≤ 0.6 smainstream acoustic limit (0.4 s SEN)
  • 210 m²Class 57 permanent exemption cap
  • A2 / A3 BERPart L NZEB heat pump & MVHR
Contemporary multi-storey institutional teaching building with modular louvred cladding, tiered courtyard entrance and landscaped green lawn

Price my classroom

Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.

A mainstream modular classroom, about 80 m² (1 classroom), permanent turnkey build: €180,000 to €280,000 ex VAT.

Step 1 of 5

What kind of school building?

Pick the closest room type. Exact TGD layout is confirmed at site walk.

How this budget guide is worked out

Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.

School modular questions answered

Which Department of Education TGDs apply to modular classrooms?

Key references are TGD-022 (Primary School Design), TGD-026 and SDG-02-04 (Special Educational Needs bases), TGD-021-5 (Acoustic Performance in Schools), and TGD-020 / TGD-021 (General Construction and Life Safety).

Are private ECCE crèches covered by Department of Education TGDs?

Private and community crèches follow Tusla's Child Care Act 1991 (Early Years Services) Regulations 2016 for clear floor space per child alongside Irish Building Regulations (Part B, Part L, Part M and BCAR).

Can I read your full cost guide alongside these specifications?

Yes. Every building type links directly to modular classroom costs in Ireland and our 4-tap budget tool.

Every Irish modular classroom page and guide

modularclassroom.ie is an independent Irish resource, not the Department of Education, the NCSE or a government body, and does not award ASA funding.

Two-storey contemporary school building with modular vertical window bays, warm timber-tone upper cladding, green school lawn and concrete footpath under overcast skies

Check your classroom budget before any call

Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.