Mainstream 80 m² modular classroom in Ireland
A permanent 80 m² mainstream modular classroom costs €180,000 to €280,000 ex VAT turnkey on a level Irish school yard (€2,200 to €3,400/m² ex VAT), delivered in 12 to 18 weeks with a 60-year steel frame.
Full Department TGD-022 layout with en-suite pupils' toilets, wet sink zone, cloakroom, acoustic ceiling and NZEB heat-pump climate control.
Free, no obligation. One local supplier prices it, not five.
- €180,000–€280,00080 m² turnkey, ex VAT
- 80 m²TGD-022 primary room area
- RT ≤ 0.6 sTGD-021-5 acoustic ceiling
- 12–18 wksorder to handover

Inside an Irish TGD-022 80 m² classroom layout
Irish primary school classrooms built to Department of Education Technical Guidance Document TGD-022 are designed around an 80 m² net floor plate rather than a bare rectangular box. Factory modular bays (typically three 3.3 m × 8.5 m or two 4.0 m × 10.5 m modules bolted cleanly together on site) reproduce the full room schedule of a masonry classroom.
Core teaching floor (62–65 m²)
28 to 30 pupils
Clear teaching zone with interactive whiteboard wall, heavy-duty marmoleum or safety vinyl flooring and dual-aspect daylighting.
En-suite pupils' WC & accessible stall
2–3 cubicles
Direct classroom supervision, sensor taps, anti-scald TMV3 valves and Part M compliant layout.
Wet sink & coat storage zone
TGD-022 joinery
Stainless art sink with plaster trap, fitted teachers' press, coat hooks and recessed whiteboard storage.
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A mainstream modular classroom, about 80 m² (1 classroom), permanent turnkey build: €180,000 to €280,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
Permanent specification checks before ordering
- Heavy galvanised steel chassis. Engineered to IS EN 1993 for a 60-year structural design life and rigid floor bounce control under jumping pupils.
- NZEB Part L thermal envelope. Continuous mineral-wool or PIR wall/roof insulation, thermally broken triple- or low-E double-glazed aluminium windows and airtightness testing.
- Quiet MVHR & heat pump heating. Low-surface-temperature radiators or underfloor loops driven by an air-to-water or VRF heat pump, paired with CO2-controlled fresh-air heat recovery.
- IS 3218 L1 fire alarm & emergency lighting. Linked back to the main school fire panel via armoured ducting so a single alarm clears the entire campus.
Related school modular guides
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
SEN & autism special suite150–250 m² sensory, withdrawal, central activity and assisted-hygiene bases.
ASA scheme & modular frameworkHow Additional School Accommodation funding and modular frameworks operate.
NZEB, heat pumps & MVHRPart L A2/A3 BER, air-to-water or VRF heat pumps and classroom CO2 control.
TGD-021-5 classroom acoustics0.6 s mainstream and 0.4 s SEN reverberation targets, walls and rain noise.
Groundworks, pads & crane liftsPad foundations, foul/storm drainage, ESB three-phase loads and holiday lifts.School modular questions answered
How much does one 80 m² permanent modular classroom cost?
Budget €180,000 to €280,000 ex VAT turnkey on a level yard with nearby foul, storm and ESB connections. Complex ASA sites with attenuation tanks or substation upgrades cost more.
Can a mainstream modular classroom be expanded later?
Yes. End walls can be structurally pre-framed with knocked-out portal beams so a second 80 m² classroom or SET room bolts straight onto the gable later.
How many days does crane installation take?
Factory-finished bays for a single 80 m² classroom are craned onto cured concrete pads in 1 to 2 days, followed by 2 to 3 weeks of joint sealing, ramp fitting and M&E commissioning.
Does a single 80 m² classroom need planning permission?
Existing schools can often use the once-off Class 57 exemption (up to 210 m² single-storey, ≥ 2 m from boundaries), though FSC, DAC and BCAR still apply.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.