Department of Education ASA scheme and modular framework
The Additional School Accommodation (ASA) scheme funds permanent mainstream classrooms, SET rooms and SEN autism suites across Ireland's 3,938 schools, with €288 million spent on modular school delivery in 2025. modularclassroom.ie is an independent Irish resource, not the Department of Education, the NCSE or a government body, and does not award ASA funding.
How Irish schools move from enrolment pressure or NCSE special-class sanction through Additional School Accommodation approval to permanent modular handover.
Free, no obligation. One local supplier prices it, not five.
- €288mmodular school spend in 2025
- TGD-022 / 026primary & SEN design guides
- 3,938recognised Irish schools
- 60 yearspermanent modular frame life

How the ASA scheme and Modular Schools Framework operate
Independent note: modularclassroom.ie is an independent Irish resource, not the Department of Education, the NCSE or a government body, and does not award ASA funding. Official application forms and circulars are published directly on gov.ie.
When a recognised primary, special or post-primary school faces confirmed enrolment growth or receives a National Council for Special Education (NCSE) sanction to open a special class, the Board of Management applies to the Planning and Building Unit under the Additional School Accommodation (ASA) scheme. Where fast delivery is vital, projects are frequently routed through the Department's Permanent Modular Accommodation Framework using Modern Methods of Construction (MMC).
- Need assessment and ASA application. The school submits enrolment projections, NCSE special-class correspondence and existing room schedules showing a clear deficit.
- Approval in principle and delivery route. The Department confirms whether the project proceeds via school-devolved grant (Board appoints its own Design Team) or Department-managed modular framework delivery.
- Site survey and statutory applications. Topographical survey, ground investigation, ESB load check, Class 57 / planning check, Fire Safety Certificate (FSC) and Disability Access Certificate (DAC) are prepared.
- Off-site factory build and holiday crane lift. Steel modules are manufactured in parallel with concrete pad groundworks, then craned onto site during school holidays and signed off under BCAR.
Price my classroom
Four quick taps and our Irish classroom budget appears before we ask for a phone number. One local supplier rings you, not five.
A mainstream modular classroom, about 80 m² (1 classroom), permanent turnkey build: €180,000 to €280,000 ex VAT.
How this budget guide is worked out
Permanent turnkey figures reflect going Irish school modular rates (€2,200 to €3,400/m² ex VAT for mainstream rooms and €2,500 to €3,700/m² ex VAT for SEN autism suites) built to 60-year structural design life, NZEB Part L A2/A3 BER, Part M access and TGD-021-5 acoustics on a level yard with reasonable crane access. Unit-and-crane rates exclude groundworks, pad foundations and service connections. Hire rates show weekly rental ex VAT with mobilisation, craneage and foundations noted separately. VAT is 13.5% on qualifying supply-and-install building contracts and 23% on modular hire. Complex ESB upgrades, storm attenuation tanks, road closures or statutory BCAR/FSC/DAC fees are priced after a site walk.
Key Technical Guidance Documents (TGDs) governing modular schools
TGD-020 & TGD-021
- What it governs
- General school construction, durability and life safety
- Impact on modular quotes
- Requires 60-year structural design life, IS 3218 L1 fire alarms and heavy-duty school doors and hardware.
TGD-022
- What it governs
- Primary school design guidelines
- Impact on modular quotes
- Sets the 80 m² mainstream classroom schedule (en-suite WC, wet sink, coat zone) and 15 m² SET room benchmark.
TGD-026 & SDG-02-04
- What it governs
- Special Educational Needs (SEN) accommodation
- Impact on modular quotes
- Defines autism classroom suites (150–250 m²), quiet withdrawal rooms, multisensory rooms and assisted hygiene.
TGD-021-5
- What it governs
- Acoustic performance in schools
- Impact on modular quotes
- Enforces RT ≤ 0.6 s in mainstream rooms, RT ≤ 0.4 s in SEN rooms, partition insulation and roof rain-noise control.
Related school modular guides
Mainstream 80 m² classroomTGD-022 floor layout, en-suite WC, wet area, NZEB heating and turnkey costs.
SEN & autism special suite150–250 m² sensory, withdrawal, central activity and assisted-hygiene bases.
Planning, BCAR, FSC & DACClass 57 (210 m²), Class 20D (5-year temporary), Assigned Certifier and certs.
Classroom costs in IrelandFull Irish ex VAT breakdown for purchase, hire, civils, cranes and fees.
TGD-021-5 classroom acoustics0.6 s mainstream and 0.4 s SEN reverberation targets, walls and rain noise.
Permanent 60-year vs prefabStructural steel frame, U-values, acoustic floors and 20-year lifecycle cost.School modular questions answered
Is modularclassroom.ie part of the Department of Education?
No. modularclassroom.ie is an independent Irish resource, not the Department of Education, the NCSE or a government body, and does not award ASA funding.
Why did Department modular expenditure reach €288m in 2025 and €299m in 2024?
Rapid expansion of mainstream primary, post-primary and NCSE-sanctioned autism special classes made factory-built permanent modular units the fastest way to open compliant 60-year classrooms before September intakes.
Can a Board of Management request modular quotes outside the central framework?
Yes. Schools funded via devolved ASA grants, Patron capital funds, ETB budgets, private fee-paying schools and community ECCE operators directly tender Irish modular school builders against TGD specifications.
Do ASA modular builds still require local council FSC and DAC?
Yes. Department funding never exempts a school from Building Control Regulations. Fire Safety Certificates, Disability Access Certificates and BCAR sign-off are mandatory.
Every Irish modular classroom page and guide
Room types
TGD & compliance
Regional coverage

Check your classroom budget before any call
Select the room type, approximate m² and buy or hire route. When you want a written school proposal, your brief goes to a single modular school supplier in your county.
